Aigaio Project

Total power

582MW

Wind turbines

138

Islets

23

Eunice Energy Group is developing the AIGAIO Project with a total wind energy capacity of 582 MW on remote and uninhabited islets of the Aegean Sea of the Cyclades and Dodecanese complex. It is a project of national & European importance realized by “Cycladika Meltemia” a Greek company, member of the Eunice Energy Group.

The installation of wind farms on small islets has the advantage of harnessing offshore wind conditions while avoiding demanding foundations and installation processes, which are technically critical for typical offshore installations.

Eunice started developing the project in 2008 with a rationale to harness outstanding off-shore wind conditions under onshore implementation environment. today, the development of the project continues with a confirmation of sound investment that will strongly contribute to the national economy.

AIGAIO Project is the future of renewable energy in the Mediterranean region. It is a challenging, utility-scale project with various technical, commercial and financial implication, but is also the project with vast merits-a flagship for the renewable energy industry, environment, and the Greek economy.

Details of AIGAIO Project

The energy production facilities are comprised of three wind farms with issued electricity Production Licenses by RAE of total capacity of 582MW. These three licenses consist of 138 wind turbines located on 23 islets.

The interconnection of the AEGEAN Project has been included in the ten-year development plan of ENTSO-E as “Project 293 – Southern Aegean Interconnector (SAI). ENTSO-E is the European Network of Transmission System Operators, representing 42 electricity transmission system operators (TSOs) from 35 countries across Europe. ENTSO-E was established by European TSOs with a mandate by the EU’s Third Legislative Package for the Internal Energy Market in 2009, which aims at further liberalizing the gas and electricity markets in the EU.

Initially, the interconnection of the AEGEAN Project has been included in “The Ten-Year Network Development Plan, TYNDP” of 2014 under the title “Southern Aegean Interconnector (SAI)” and successfully remained in the plan’s recent update of 2016 (TYNDP 2016), 2018 (TYNDP 2018), 2020 (TYNDP 2020) and 2022 (TYNDP 2022).

For more information follow the link bellow

Project’s page on entsoe websiteENTSO-E Map