Arkadias Wind Farms

Total Power

16,2MW

In 2007, Eunice Energy Group built and since then operates the Wind Park «Aiolika Parka Arkadias», with a total power of 11,5MW. The extension of the existing park by 4.7 MW was completed in 2019.